Power plant · Nevada

Arrow Canyon Solar Hybrid

Arrow Canyon Solar Hybrid is a 275 MW sun power plant in Nevada, in service since 2023.

Nameplate capacity
275 MW
Primary fuel
SUN
Status
Operating
since 2023
Annual generation
630.2 GWh
2023 data

Location

Arrow Canyon Solar Hybrid is located Nevada, at 36.4593°, -114.8444° (highlighted below among other power plants in the state).

Arrow Canyon Solar Hybrid location in NevadaChuck Lenzie Generating Station · 1.5 GWClark (NVE) · 1.4 GWSilverhawk · 1.1 GWHoover Dam (NV) · 1.0 GWTracy · 1.0 GWHarry Allen · 745 MWHiggins Generating Station · 688 MWApex Generating Station · 601 MWNorth Valmy · 567 MWDesert Star Energy Center · 537 MWTS Power Plant · 442 MWLas Vegas Generating Station · 359 MWEagle Shadow Mountain Solar Farm · 300 MWTownsite Solar Project Hybrid · 270 MWSilver State Solar Power South · 260 MWCopper Mountain Solar 3 · 255 MWCopper Mountain Solar 5, LLC · 252 MWMoapa Southern Paiute · 250 MWDodge Flat · 250 MWFort Churchill · 230 MWSun Peak Generating Station · 222 MWReid Gardner · 220 MWTechren Solar II LLC · 200 MWYellow Pine Solar · 190 MWCopper Mountain Solar 2 · 154 MWSpring Valley Wind Project · 150 MWSaguaro Power · 127 MWBattle Mountain Solar Project · 126 MWFish Springs · 125 MWCrescent Dunes Solar Energy · 125 MWWestern 102 Power Plant · 119 MWMcGinness Hills · 104 MWSunshine Valley Solar · 104 MWPlaya Solar 2 · 100 MWHarry Allen Solar Energy LLC · 100 MWTechren Solar I LLC · 100 MWBoulder Solar Power, LLC · 100 MWMcGinness Hills 3 · 99 MWNevada Cogen Associates 2 Black Mountain · 96 MWNevada Cogen Assoc#1 GarnetVly · 95 MWCopper Mountain Solar 4, LLC · 94 MWPlaya Solar 1, LLC · 79 MWNevada Solar One · 76 MWTungsten Mountain · 75 MWDixie Valley · 71 MWStillwater Facility · 69 MWNGP Blue Mountain I LLC · 64 MWTurquoise Nevada, LLC · 60 MWPatua Acquisition Project, LLC · 59 MWSilver State Solar Power North · 52 MWLuning Energy · 50 MWBoulder Solar II, LLC · 50 MWTechren Solar V · 50 MWCM48 · 48 MWSteamboat Hills LP · 37 MWNorth Valley · 37 MWBeowawe · 35 MWTuscarora Geothermal Power Plant · 32 MWGalena 3 Geothermal Power Plant · 32 MWSpectrum Solar PV Power Project · 30 MWBrady · 30 MWSteamboat II · 26 MWSteamboat III · 26 MWRichard Burdette Geothermal · 26 MWDesert Peak Power Plant · 26 MWSoda Lake 3 · 26 MWTechren Solar III LLC · 25 MWTechren Solar IV LLC · 25 MWSalt Wells · 24 MWJersey Valley Geothermal Power Plant · 24 MWStar Peak Geothermal Plant · 22 MWDon A Campbell 2 Geothermal · 20 MWStillwater Solar PV II · 20 MWApex Solar PV Power Project · 20 MWDon A Campbell 1 Geothermal · 20 MWMountain View Solar · 20 MWFt. Churchill PV · 20 MWSearchlight Solar · 18 MWGalena 2 Geothermal Power Plant · 17 MWArrow Canyon Solar Hybrid · 275 MW42.3°N, 120.2°W34.7°N, 113.8°W
  • Renewable
  • Nuclear
  • Fossil
  • Other

About this plant

Arrow Canyon Solar Hybrid is a sun generating station located in Nevada. The plant has a nameplate capacity of 275 MW. It has been in service since 2023. Plant coordinates: 36.4593°, -114.8444°.